Teardrop Trailer – Build Day 12

ANOTHER LAYER OF PAINT

HardAtWorkHARD AT WORK

FramingFrontWindowLAYING OUT THE FRONT WALL
I arranged the pieces of the frame around the front window with the backing in place to ensure a good fit.

FramingFrontWindow01WATERPROOF TAPE AROUND WINDOW OPENING
Just in case the window leaks I added a little extra waterproofing.

FrontWindowINSULATED AND FRAMED FRONT WALL
Here is the finished and insulated frame for the front wall. I’ll skin this once it’s in place.  I’m prefabbing pieces as much as possible, once I assemble this thing it’s going to get hard to move around my little workshop.

KarenForScale2ND LAYER OF PAINT
Karen generously posing with a wall to help illustrate scale. Today I sanded the walls a bit more and added a second layer of paint. It’s still not as smooth as I’d like, I’m going to sand and go for another layer and then sand again.